City of Wichita - Storm Water Utility Main
Wednesday, January 07, 2009 :: Currently 41 degrees in Wichita

Orange construction signage showing people at work

Public Works
City Hall, 7th floor
455 N. Main
Wichita, Kansas 67202

Hours:
8:00 AM - 5:00 PM
Monday - Friday

Stormwater Design and Hot Spots
Phone: (316) 268-4498
Fax: (316) 268-4114

Scott Lindebak
Civil Engineer

Stormwater Drainage Maintenance
Phone: (316) 268-4498
Fax: (316) 268-4008

Tim Davidson
Engineer


Leaving City Of Wichita Website

Storm Water Utility

The Storm Water Utility is responsible for the construction, reconstruction and maintenance of the City’s storm water drainage system, as well as the water quality aspects of the City’s storm water pollution prevention program.  Operational sections are located within the Public Works Department and the Environmental Services Department.

Photo showing storm water inlet in street.

The Equivalent Residential Unit (ERU) fee is a monthly fee paid by the owners of all properties in the City to support the efforts of the Utility. In 2007, the ERU fee is $2.00 per ERU per month. One ERU is equivalent to 2,139 square feet of impervious area. Residential units are billed 1 ERU or $2.00 monthly. Commercial and industrial facilities are billed $2.00 per month for every 2,139 square feet of impervious area on their property. For property owners with water and/or sewer accounts, the Utility fee is billed monthly on their water and sewer bill. For owners without water and sewer accounts, the Storm Water Utility billing is done twice a year.

The Storm Water Utility also includes the Flood Control section, which is responsible for maintaining the Wichita-Valley Center Flood Control Project “Big Ditch”. These duties include the floodway, Big and Little Arkansas Rivers, and major streams and creeks within the project limits in accordance with standards established by the Army Corps of Engineers.  Total acres maintained by the Flood Control section is 8,612.

Current Projects

  • Wichita-Sedgwick County Drainage Criteria Manual
  • Citywide Storm Water Structures Inventory


Public Notices

CINCH December 2008

Necessary Submittal Documents:

QT ERU (Example)

Siena Plaza ERU (Example)

Other Resources

 

Back to Top

Printer Friendly Version

Related to
Storm Water Utility
Floodplain Management Task Force
Frequently Asked Questions
Hot Spot Projects
Main
Storm Water Utility Documents and Forms
Tasks Performed by Flood Control Unit
Tasks Performed by Storm Water Utility


  © Copyright  2009 City of Wichita / 455 N. Main, Wichita, KS 67202